| Bristol Tennessee Essential Services (BTES) 350 mile FTTP network. |
| Atlantic Engineering Group
Participation |
AEG was selected, through a competitive bid process, to design, engineer, and build BTES 350 mile FTTP network.
- AEG built the BTES FTTP network as a design / build project.
- AEG designed and built the BTES Headend.
- AEG performed construction management.
- AEG performed materials management.
- AEG was selected to design and build the County once the City was complete.
|
| The City project is complete. The County project is currently under construction. |